Client: Physikalisch-Technische Bundesanstalt (PTB), Section Q.33
Project: Quality Infrastructure for Sustainable Development with a focus on the circular economy (“Circularidad con Calidad”, CCC)
Country: Mexico, with a focus on the state of Querétaro
Role: Lead of the external evaluation (principal evaluator), together with a technical evaluator from another PTB department
Status: ongoing, final report planned for early 2027
What it is about
PTB, Germany’s national metrology institute, has commissioned me to carry out the external evaluation of its project in Mexico, financed by the German Federal Ministry for Economic Cooperation and Development (BMZ). The project runs from February 2023 to January 2027 and was extended by one year at no additional cost. Its volume is EUR 1 million.
The starting question is unassuming but far-reaching: how can a recycled material prove that it is as good as a new one? Without reliable standards, test methods, measurements and accreditation, secondary raw materials cannot demonstrate their quality. They then lose out to virgin material, and investment in the circular economy fails to materialise.
This is where the project comes in. It supports Mexican quality infrastructure institutions in aligning their services and instruments with the requirements of the circular economy. The partners are the standards department of the Ministry of Economy (DGN) as the policy partner, the national metrology institute CENAM, the accreditation body ema, and the standardisation and certification organisations NYCE and NORMEX. Pilot projects address, among other things, the recyclability of plastics, microplastics and water cycles. The target group includes companies and associations such as ANIPAC and the Querétaro plastics cluster.
Why this matters now
Mexico is under pressure and on the move at the same time. According to the inception report, around 139,902 tonnes of municipal waste are generated every day, the recycling rate was most recently about 10 per cent (as of 2017), and industrial core regions in the centre of the country face high water stress.
The political environment has changed markedly. The Quality Infrastructure Law was passed in 2020, a general circular economy law is being advanced in the Senate, and under the new federal government from late 2024 the topic is moving into the National Development Plan 2025 to 2030 and the “Plan México” strategy. Several states, above all Querétaro, have presented their own action plans and regulations. Export-oriented industries must also decarbonise and reduce their water footprint to stay competitive in global value chains.
The evaluation also comes at a moment when the course is being reset. The project is to be followed by a successor project on renewable energy and energy efficiency, which will retain some of the existing partners. The lessons from the circular economy work should therefore not end up in an archive, but feed into the next cooperation.
What makes the task demanding
In my view, the difficulties of this evaluation lie in six places.
- Impact arises in a system, not in one organisation.
The project does not aim to improve a single product, but to change the interplay of standardisation, metrology, accreditation, conformity assessment, industry and policy. The results logic has several stages: shared awareness-raising, practical pilot projects, then capacity building in the institutions. Chains like these cannot be read off a single figure. - Two political speeds.
At federal level, key framework conditions were waiting on regulations and laws. In Querétaro, progress was considerably faster. The evaluation must judge how a project copes with these different tempos, without blaming it for matters beyond its influence. - Attributing contributions.
Other projects work on the same environment in Mexico, such as GIZ’s PROCEP on plastic waste, the Global Project Quality Infrastructure and, regionally, the QI4CE project. Determining which contribution can be attributed to the PTB project, and where synergies lie, is one of the most delicate methodological tasks. - Indicators that demand precision.
The targets are quantitative: two strategy documents, 13 services or instruments and four consolidated pilot projects. At the same time, it must be clarified what counts as a “service” or an “instrument” so that nothing is counted twice. This is where sound measurement parts company with mere bookkeeping. - Limited field time, many perspectives.
Eleven days are available for data collection in Mexico City and Querétaro, supplemented by virtual conversations. Interviewees include ministries, standardisation and testing institutions, research centres, associations and companies. The usual risks of qualitative research apply as well: social desirability, limited willingness to talk and concerns about confidentiality. - Accountability and learning at once.
The evaluation serves accountability to the BMZ and the Mexican partners. It is equally meant to provide lessons for the successor project and for other PTB projects. Serving both at the same time requires independence and the ability to engage in dialogue.
Methodological approach
The evaluation follows the DeGEval standards and the six OECD-DAC criteria (relevance, coherence, effectiveness, efficiency, impact, sustainability). The Capacity WORKS management model of German cooperation is incorporated with its five success factors. The evaluation standards for Latin America and the Caribbean (ReLAC) have also been taken into account.
At its core is a realist evaluation, which asks not only whether something worked, but how, why and under what conditions. This is combined with a mixed-methods design and triangulation: systematic document analysis, semi-structured interviews in Spanish and a validation workshop with stakeholders. The workshop is intended to test preliminary findings jointly and to strengthen the partners’ ownership of the results.
Beyond the standard criteria, PTB’s evaluation unit and the project coordination have formulated five questions of particular interest: the transferability of experience, success factors and obstacles in awareness-raising, cooperation with the private sector, synergies and attribution, and recommendations for the successor project.
Status and next steps
The inception report was submitted in August 2026. Data collection in Mexico is under way or complete, and the virtual validation workshop with the partners is planned for early November 2026. The draft evaluation report follows at the end of November, the final version with summary and one-pager at the end of January 2027, and the presentation to PTB at the end of February 2027.
Findings and recommendations will be made available once the evaluation is complete and PTB has approved them. PTB publishes its evaluation reports at evaluierung.ptb.de.
My role
I am responsible for the methodological design, conduct the interviews, facilitate the validation workshop, write the reports and act as the contact person for the project team and PTB’s evaluation unit. My colleague contributes the technical perspective on quality infrastructure.
Focus areas of this reference: evaluation of technical cooperation, quality infrastructure, circular economy, realist evaluation, mixed methods, Latin America.